At AELIUS Energies SLU, we demonstrate our technical and management expertise throughout the entire project life cycle, ensuring excellence at every stage of development. From initial business development to final commissioning, our team navigates the complexities of engineering, procurement, and construction management with precision and skill. Our comprehensive approach allows us to deliver innovative and efficient renewable energy solutions, fostering a sustainable future for our clients and communities. Explore our diverse portfolio of projects to see how AELIUS Energies SLU is transforming the energy landscape with our exceptional experience and proficiency.
SECTOR | PROJECT NAME | SERVICES | COUNTRY |
---|---|---|---|
ADB TKM | Technical Consultancy services, pre feasibility studies and conceptual design | Turkmenistan/Philippines/Spain | |
CSP Modelling for Spanish auctions LCoE lowering | Modelling of different CSP Plant capabilities and TES hours, to achieve lower LCoE, for the Spanish auction under PNIEC | Spain | |
Likana Molten Salt Tower 3x 200 MW CSP Project | Business Development and Consultancy Services for the support engineering for EPC bidding | Chile/China/Spain | |
450 MW Tuzla CPP | Business Development Services for the Basic engineering review | China/Spain/Bosnia | |
Minos Molten Salt Tower CSP Project | Technical Consultancy Services for the basic engineering | China/Spain/Greece | |
DEWA Phase IV (700 MW CSP + 250 MW PV) | Business Development Services for the project main engineering | UAE/China/Spain | |
H2020 Proposal "Flexible Retrofitted Sustainable Coal plants by integration of Electrically Heated Thermal Energy” | Technical Consultancy Services for the TES system engineering and overall constructibility | Denmark/Spain/Belgium | |
Urat 100 MW Parabolic Trough CSP | Business Development and Consultancy Services for the basic engineering | China/Spain |
TEAM MAIN REFERENCES PREVIOUS TO AELIUS Energies SLU
SECTOR | PROJECT NAME | SERVICES | COUNTRY |
---|---|---|---|
DEWA Phase IV (1x100 MW CT+3x200 MW PT) CSP | Consultancy Services to support the preparation and optimisation of the alternative winning proposal during the bidding process | UAE/China | |
NOORo-II 200 MW PT CSP | Project Management | Morocco | |
NOORo-III 150 MW CT CSP | Project Management | Morocco | |
NOORo-II and NOORo-III | Project Management during the bidding stage of the EPC proposal to ENGIE-MASDAR Consortium | Spain/UAE/Morocco | |
Shiddhirganj 335 MW CCPP | Project Management | Bangladesh/Spain | |
Diwakar 100 MW PT CSP and the KVK 100 MW PT CSP | Project Management | India | |
Askandra 35 MW PV | Project Management | India |
|
Termosol-I 50 MW PT CSP | Site Management | Spain/USA | |
Termosol-II 50 MW PT CSP | Site Management | Spain/USA | |
EDC Sur 140 MW OCGT | Site Management | Venezuela/Spain | |
LDPE and EPU Plants (Dow Chemical Tarragona Sur Factory) | Construction Management during the 2011 turnaround | Spain | |
SAMCA-I "La Florida" 50 MW PT CSP | Site Management | Spain | |
Emile Huchet 2x430 MW CCPP | Site Management | France | |
CADU-II Unit revamping (Tenerife Refinery) | Site Management | Spain | |
Tarragona Refinery hydro-cracker | Maintenance Management | Spain |